Port Everglades Terminal 2 & 4 Garage

 

Completed in 2021, the 854,165 SF, Port Everglades Cruise Terminal Garage features over 1800+ spaces. Construction was carefully phased and  maintenance of traffic closely coordinated on this very tight site to mitigate disruptions to cargo ships, cruise ships and their passengers and the neighboring convention center, which all remain operational throughout the project. This project features 2 moving walkways in an air-conditioned pedestrian bridge that is elevated 50’ in the air above an existing and occupied cruise terminal and solar arrays located on the top deck to reduce power consumption.

 

Owner: Broward County  Location: Fort Lauderdale, Florida

 

Overview: New Construction // 854,165 SF